| Спецификация | Nominal size: 25 mm versus 25.4 mm Grade 2 tube, OD tolerance plus or minus 0.10 mm from the site specification page |
|---|---|
| Применимый стандарт | Mating part: drilled tubesheet hole, hole tolerance callout, pitch, ligament and tube-end projection |
| Состояние материала | Governing drawing: tubesheet drilling drawing revision and ASTM B338 or ASME SB-338 edition named in the PO |
| Контроль и упаковка | :Tolerance basis: OD band plus hole band into a diametral clearance window, expansion ratio and projection chain |
Описание продукции: 25 mm and 25.4 mm Gr2 tubes are nominally equal, but the tubesheet hole is not. How OD and hole tolerance stack into the fit-up clearance window.
A 25 mm Grade 2 titanium condenser tube and a 25.4 mm one are nominally the same tube, and our 25 mm specification page already settles that equivalence, the OD tolerance it quotes as plus or minus 0.10 mm, the wall thickness range, straightness, expanding and welding, U-bending, composition, NDT and lead time. We treat all of that as a known input rather than restating it. Our ordering-by-failure-mode guide and our vibration and re-tube guide belong to the same first line: what the size is, what standard to buy it to and what the bundle will see in service. That page tells you what the size is and what standard to buy. This article starts where it stops: whether that OD actually assembles into the tubesheet hole. The two are independent check lines, not competing ones. A tube OD band stacked on a hole tolerance band produces a diametral clearance window, and that window, not the nominal 25 mm, decides whether the joint can be rolled and seal-welded.
| Item | What the decision turns on |
|---|---|
| The short answer | 25 mm and 25.4 mm are nominally the same tube, but the drilled hole is not nominally the same |
| The governing identity | Diametral clearance equals measured hole diameter minus measured tube OD, both with their bands |
| The stack-up trap | A tube at the top of its OD band in a hole at the bottom of its band closes the window hardest |
| Where plus tolerance goes | The OD band from the site specification page is a known input, not the fit result |
| The rolling question | Expansion ratio is variously defined as wall reduction, bore growth or OD growth |
| The projection question | Tube-end projection depends on whether the joint is expanded, seal-welded or strength-welded |
| The re-drill question | A hole accepted for one OD band does not automatically accept a substituted band |
| The one document | A 14-line Tube-to-Tubesheet Fit-Up and Dimension Chain Verification Sheet: check, basis, method, criterion, who signs |
Rows two and three carry most of the rework. Our B338 tube guide gives the product context and our 25 mm specification page fixes the OD band as a known input. A mill certificate can certify a heat; it cannot certify a clearance window it did not measure for your tubesheet. Read the rest as the second check line that starts where the certificate stops.
The purchasing equivalence between 25 mm and 25.4 mm is a statement about the tube, not about the drilled tubesheet. Our 25 mm specification page and our tube OD classification page settle the tube side as a known input. The hole is a separate manufactured feature with its own diameter tolerance, pitch and surface finish, called out on the tubesheet selection page and the drilling drawing. Treating the two nominal sizes as interchangeable at the hole is the trap: equivalent tube does not mean equivalent fit.
Our seamless B338 tube page and our custom-drilled baffle and tubesheet page show the two parts that must meet. The specification line fixes what was bought; the fit-up line fixes whether the OD band and the hole band leave a workable clearance. They are two independent check lines, and a pass on the first does not grant a pass on the second.
Nominal equivalence is a purchasing statement. A clearance window is a geometric result of two tolerance bands measured on the parts.
The fit chain is one identity, not a spec table. Diametral clearance equals the measured hole diameter minus the measured tube OD at the same axial station, and each term carries its own tolerance band. The worst case is not two nominal numbers: it is a tube at the top of its OD band entering a hole at the bottom of the hole band, or the reverse. Written this way the arithmetic is deterministic. None of these terms is a supplier promise; they are quantities the shop must close with measurements on the delivered tube and the drilled plate.
Our tube-sheet welded joint detail shows the interface, and our tube weld and early-failure guide shows why rolled and seal-welded joints are sensitive to the starting gap. Our WPS and NDT qualification guide covers the weld procedure record. Name the drilling drawing revision and the hole tolerance callout before quoting any clearance number; where published bands disagree, we publish the conflict in chapter six.
Two dimensions decide whether a tube that fits the hole stays sealed, and neither is the nominal OD. Expansion ratio describes how far the tube wall is thinned and the bore opened by rolling to close the clearance; published figures define it as wall-thickness reduction, bore growth or OD growth, so a single percentage is not portable. Tube-end projection is how far the tube stands past the tubesheet face before a seal weld, and the correct value depends on the joint detail. Our tube bundle assembly page and our cut-to-length tube page give the product and cut context; the drawing fixes the projection.
Projection and expansion form one dimension chain with the tubesheet thickness and the tube stick-out. Cut the tube short and the weld land disappears; roll too far and the wall thins into the tolerance floor. Our U-bent condenser tube page shows a formed end where the chain is fixed before the bundle is built. Measure both on a station log rather than from the cut list.
A cut list is a purchase input, not a fit result. Re-measure projection and wall after rolling against the joint detail before release.
Whether a substituted OD needs a re-drill
If a bundle is swapped from one nominal size to the other, the drilled hole is the fixed feature and the tube is the variable. A hole drilled and accepted for one OD band does not automatically accept a substituted band, because the clearance window recomputes. Our 25/32/50 mm OD stock page and our exchanger built to client drawing page show why the drilling drawing, not the stock list, decides. Ream only if the drawing revision and the remaining ligament allow it, otherwise the plate is re-drilled or rejected.
Ligament and hole-bridge width
The minimum bridge between adjacent holes is a function of pitch and hole diameter, not a fixed number. A hole enlarged for a different OD band consumes ligament, and a thin bridge distorts under rolling and leaks under pressure. Our drilled baffle and tubesheet page gives the drilling context and our titanium tube range lists the product. Confirm the pitch, the hole callout and the minimum ligament against the named drawing clause and code edition.
Re-tube span goes to the vibration line
After a re-tube, the unsupported span and the baffle spacing are a separate check that belongs to our vibration and re-tube guide, not to this fit-up line. We do not restate it here. This line closes at the hole, the clearance and the joint; the span check closes at the bundle dynamics. Both records are valid and are signed at different gates.
Ask several sources for a tubesheet hole tolerance, an expansion ratio or a tube-end projection and you get a spread, not one table. Product standards, vessel codes, TEMA-class tables and rolling procedure notes use different definitions and different joint types. Presenting any one figure as correct would be false precision. The values below are the conflict, not the controlling number. The controlling value is the one measured on these parts and named in the drawing revision and the purchase order. Our OD classification page and our B338 guide are product references, not the governing clause.
| Quantity | Figures in conflict | Why they disagree | What to confirm |
|---|---|---|---|
| Diametral tube-to-hole clearance | Our 25 mm page quotes an OD tolerance of plus or minus 0.10 mm as a known input; hole tolerance is variously a fixed band, a percentage of tube OD or a fit class on the vessel drawing | Different governing documents and whether the clearance is diametral or radial | Named drilling drawing revision, hole callout and paired OD/hole readings at mapped stations |
| Expansion ratio for the rolled joint | Published figures are variously wall-thickness reduction, bore growth or OD growth, with different acceptor bands for rolled-only versus rolled-and-welded joints | Different definitions of the ratio and different joint types | Named rolling procedure version, definition used and a before/after wall and bore survey |
| Tube-end projection past the face | Joint details variously call for flush, a small projection for a seal weld or a specified recess | Expanded-only, seal-welded and strength-welded joints need different lands | Named joint detail, weld symbol and the measured stick-out before welding |
| Minimum ligament between holes | Codes and TEMA-class tables express the minimum bridge as a function of pitch and hole diameter, not one fixed number | Different pitch, hole diameter and code class; a larger hole consumes bridge | Named code edition, pitch, hole callout and measured bridge at the tightest station |
| Hole surface finish for rolling | Some guides specify a roughness range for expanded joints, others leave it to the rolling procedure qualification | Different roller types and whether a seal weld follows the roll | Named procedure, roughness measurement and the qualification record |
| Whether a 25-to-25.4 substitution needs a re-drill | Nominal equivalence is a purchasing statement, not a fit statement; one drilled band does not automatically accept the other OD band | Purchasing equivalence versus geometric clearance on an existing plate | Recomputed clearance window, remaining ligament and a signed re-drill or ream decision |
Our 25 mm specification page gives the OD band as a known input and our heat exchanger mill certificate page shows the form of a traceable record. A chart is a buying aid; the measured clearance and the signed verification sheet are the tie breakers. Chapter ten gives six actions that settle the numbers.
Whether a delivered tube passes receiving inspection, and whether a finished bundle passes a hydrostatic test, are separate questions. They belong to the receiving line and the test line that our tube receiving inspection page, our hydrostatic test guide and our tube weight calculator already cover. We do not restate those lines. This line decides whether the OD band and the hole band leave a clearance the joint can close. All are valid, they are checked at different gates, and a pass on one does not grant a pass on another.
Keep the records separate. The receiving file holds the purchase order, the certificate and the dimensional acceptance of the tube as delivered. The test file holds the pressure record after assembly. The fit-up file holds the drilling drawing revision, the paired OD and hole survey, the expansion basis, the projection log, the ligament check and the signed 14-line sheet. Our equipment leak repair guide is a downstream consequence, not a substitute for the fit-up record. When an enquiry asks about receipt we point to receiving; when it asks whether a substituted tube will seat in an existing plate, we work the clearance chain.
Recompute the clearance window from paired OD and hole readings rather than the nominal size. A purchase substitution that treats the two diameters as identical skips the band stack entirely. Judge against the drilling drawing revision and the measured hole. Our 25 mm specification page is a buying reference, not the fit record. In a dispute, rebuild the chain from the hole survey and photograph the tube end before rolling.
Measure both features at mapped stations and carry the full band into the diametral clearance calculation. A nominal gap is incomplete fit-up evidence. Our OD classification page names the tube side and our drilled plate page names the hole side. In a dispute, re-survey the hole and the tube rather than the certificate.
Measure the tightest bridge between adjacent holes against the named code clause before and after any ream. An oversized hole consumes ligament and distorts under rolling. Our tube-sheet joint detail gives the interface. In a dispute, hold the plate and re-check pitch and hole diameter at every station.
Compare the measured diametral clearance with the band in the named rolling procedure, then confirm by a trial roll on a witness coupon. A gap the roller cannot close becomes a weeper. Our weld and early-failure guide shows the downstream cost. In a dispute, re-pair the OD and hole readings and reset the expansion target.
State whether the ratio means wall reduction, bore growth or OD growth, and measure the wall before and after rolling on the same definition. A percentage quoted without its definition is not portable. Our WPS and NDT qualification guide shows a signed procedure decision. In a dispute, re-qualify the roll and re-log the wall survey.
Measure stick-out against the weld symbol and joint detail at each tube end, not from the cut list. A short tube loses the weld land; an over-long one disturbs the channel. Our cut-to-length tube page gives the cut context. In a dispute, re-measure projection and re-cut before welding.
Any change of OD, wall or support spacing resets the unsupported span that belongs to our vibration and re-tube guide. Issue the revised span and baffle layout to that line before the bundle is released. A fit-up pass does not cover bundle dynamics. In a dispute, hold the release until the span check is signed.
Reconcile every tube and every hole against the drilling drawing revision, the expansion basis, the projection log and the signed 14-line sheet. A joint whose clearance map cannot be rebuilt is a reject regardless of a clean mill certificate. Our mill certificate page shows what the mill record proves. In a dispute, restore the hole-to-tube map before release.
| # | Fit-up check | Basis drawing or standard edition | Measurement method | Acceptance criterion | Who signs |
|---|---|---|---|---|---|
| 1 | Tube OD band and hole band both named | ASTM B338 or ASME SB-338 edition in PO plus drilling drawing revision | Document review | One designation with revision per part | Buyer QA |
| 2 | Tube OD measured at mapped stations, not nominal | MTC and tube marking | Calibrated OD micrometer or laser gauge, mapped points | Mean and local extremes logged | Fabrication inspector |
| 3 | Drilled hole diameter measured, not nominal | Tubesheet drilling drawing revision | Calibrated bore gauge or plug gauge at mapped holes | Local minima and maxima logged | Fabrication inspector |
| 4 | Hole tolerance callout and fit class identified | Vessel drawing and code edition named in PO | Check the named drawing table | Band named, deviation carried into the chain | Fabricator engineer |
| 5 | Diametral clearance window recomputed from paired readings | Drilling drawing and fit-up plan | Subtract paired OD from paired hole at each station | Window inside the named rolling procedure band | Fabricator engineer |
| 6 | Worst-case stack of plus OD into minus hole checked | OD band and hole band from the named editions | Independent recalculation of the limit case | Limit case still leaves a closable gap | Fabrication inspector |
| 7 | Expansion ratio definition and target stated | Rolling procedure version and WPS | Document review and a witness-coupon roll | Definition, target and acceptor band named | Welding inspector |
| 8 | Wall thickness before and after rolling surveyed | Procedure plan and tube wall band | Ultrasonic wall gauge at mapped stations | Wall reduction inside the named band | Process supervisor |
| 9 | Tube-end projection or recess checked per joint detail | Weld symbol and joint detail | Depth gauge or height gauge at each tube end | Projection inside the joint detail band | Welding inspector |
| 10 | Remaining ligament between holes checked | Code edition, pitch and hole callout | Measure the tightest bridge at mapped stations | Bridge at or above the named minimum | Fabricator engineer |
| 11 | Hole surface finish for rolling confirmed | Rolling procedure and roughness clause | Roughness comparator or profilometer on sample holes | Finish inside the procedure band | Machining supervisor |
| 12 | Re-drill or ream decision signed for a substituted OD | Drilling drawing revision and clearance recomputation | Compare existing hole band with the new OD band | Re-drill, ream or reject recorded with reason | Design engineer |
| 13 | Re-tube span and baffle layout forwarded to the vibration line | Bundle drawing revision | Review the unsupported span against the re-tube guide | Span check released by that line | Quality lead |
| 14 | Cumulative fit, joint trial and signed sheet released | General arrangement and dimension chain | Trial roll, leak check and reconcile hole to tube | Joint sealed, hold released | Quality lead and buyer |
Line five is often answered with two nominal numbers instead of paired readings, line six with a single gap instead of the limit case, line seven with an undefined percentage and line nine with a cut list rather than a measured projection. Our tube receiving page and our mill certificate page separate material evidence from fit-up work, and our hydrostatic test guide and our equipment leak repair guide show the downstream cost of an undocumented joint. A sheet without a signature column is a note, not an inspection record. Confirm every criterion against the drawing revision and the standard edition named in the purchase order.
Most of these cost nothing at planning and a great deal after a bundle is rolled and welded. Ask for the drilling drawing revision, the paired OD and hole survey, the rolling coupon, the projection log and the signed verification sheet for the same bundle. We are a stockholder, not the author of your drawing; where figures come from published guides we label them, and where they disagree we give the disagreement and the action. Our hydrostatic test guide is a later gate, not a substitute for the fit-up record. Confirm the governing criterion against the drawing revision and the standard edition in the purchase order.
Choose X if: a ream-and-re-roll with a signed verification sheet
Escalate to a fit-up hold or a drawing review if:
Choose Y if: a re-drill or a rejected plate
The whole subject reduces to one sentence: a nominal size is not a fit, because the drawing tells you what to order while the tolerance chain tells you whether the tube will seat in the hole. When you enquire, send the tube OD band, the drilled hole callout, the pitch, the joint detail, the drawing revision and the paired survey. We are a Baoji China Titanium Valley titanium stockholder with roughly 800 tonnes in stock, about 80 tonnes of it in tube. We cut to non-standard and small-batch sizes, work from customer drawings, read and certify to ASTM, ASME and GB standards, export-pack in house, and dispatch confirmed in-stock orders the same day. Send us the drilling drawing and the paired survey, and we will tell you what we can ship and which decisions belong with your team. Request a quote →
No. The two diameters are nominally the same tube, but the drilled hole is a separate feature with its own tolerance band. A hole drilled and accepted for one OD band does not automatically accept a substituted band, because the diametral clearance window recomputes. Measure the tube OD and the hole diameter at mapped stations, subtract them as a pair and compare the window with the named rolling procedure before any substitution. The fabricator engineer signs that check against the drilling drawing revision.
It is a paired measurement, not a nominal subtraction. Diametral clearance equals the measured hole diameter minus the measured tube OD at the same axial station, and both terms carry tolerance bands. Check the worst case as well: a tube at the top of its OD band in a hole at the bottom of the hole band. Name the drilling drawing revision and the hole tolerance callout, and record the paired survey. The fabrication inspector logs the local extremes rather than a single gap.
Only if the recomputed clearance and the remaining ligament allow no other route. Reaming an existing hole to a larger band consumes the bridge between holes and may fall below the named minimum, so the decision is a drawing one, not a shop convenience. Recompute the clearance window, measure the tightest ligament and sign a re-drill, ream or reject decision against the drilling drawing revision. A fit-up pass does not by itself authorise a re-drill.
No. A certificate proves the tube OD band, wall and heat as delivered; it does not measure the drilled hole or the resulting clearance. Fit-up evidence is the paired OD and hole survey, the expansion basis, the projection log, the ligament check and the signed 14-line verification sheet. These are two independent check lines at different gates. A tube can be on certificate and still leave an unclosable gap in an existing plate.
Because sources define them differently. Expansion ratio is variously wall-thickness reduction, bore growth or OD growth, and acceptor bands differ for rolled-only versus rolled-and-welded joints. Projection depends on whether the joint is expanded, seal-welded or strength-welded. We publish the conflict rather than one figure. Name the rolling procedure version and the joint detail, measure wall before and after rolling and measure projection per tube end. The welding inspector signs both.
The fabrication inspector signs the paired OD and hole survey and station map against the drilling drawing revision and the measurement plan, the welding inspector signs the expansion target and projection log against the rolling procedure and joint detail, and the fabricator engineer signs the ligament check against the code edition. A single reading is not a survey: measure at mapped stations because both the OD band and the hole band vary across the bundle.
No. They are independent lines at different gates. Receiving decides whether the delivered tube meets its OD and wall band, and the hydrostatic test decides whether the finished bundle holds pressure; neither measures the clearance window at the hole. The fit-up line uses the drilling drawing revision, the paired survey, the expansion basis, the projection log, the ligament check and the signed sheet. A pass on one does not grant a pass on another.
Tell us what you need. Send the points below and we reply with live stock status, price and lead time — usually the same day.
Send us these 6 points (or just attach your drawing / old supplier spec)
| 1 | Material grade — Gr2 / Gr5 / Gr7 / Gr12, Ni200 / Ni201 / Monel 400, Zr702… |
| 2 | Form — plate / tube / bar / wire / fitting / flange / fastener / equipment |
| 3 | Size & tolerance — thickness×width×length / OD×WT / diameter |
| 4 | Quantity — kg / pcs / m (small batch and non-standard sizes welcome) |
| 5 | Standard — ASTM B265 / B338 / B348, ASME B16.5, EN 1092-1… |
| 6 | Application & destination — helps us pick the right grade and certifications |
Not sure how to fill this? Send your drawing or an old supplier's specification sheet — we will break it down for you.
Reach us directly
Email: [email protected]
WhatsApp / WeChat:+8618829679311 leave your number on the form
Or use the inquiry form on this page — attach your drawing and we will respond within one business day.
Why buyers come to us
Stock holder in Baoji Titanium Valley with ~800 t inventory · cut-to-size and small batch · drawing-based machining for non-standard parts · we read ASTM / ASME / GB specs · export experience · same-day response on quotes.
Опишите ваши требования — марка, размер и количество. Ответим в течение 24 часов.
Предпочитаете чат? WhatsApp +86 188 2967 9311 или напишите на [email protected].
Контактное лицо: Wang Xiaoning
Телефон: +86-917-355-7966
Эл. почта: [email protected]
WhatsApp: +86 188 2967 9311
Компания: Shaanxi Qianyi Tuoda Technology Co., Ltd
Адрес: Floor 4, Building 4, No. 188 Gaoxin Avenue, High-tech Zone, Baoji City, Shaanxi Province, China